Introduction
The cases on this page come from the PermitDossier case monitor, compiled from official public records and checked 2026-11-29. The Raleigh file (case-monitor/wake-cases-3.md, snapshot 2026-11-28) puts 23 Raleigh cases on file: 18 in process and 5 decided in November 2026. A follow-up check on 2026-11-29 (case-monitor/raleigh-1201-hearing-check-20261129.md) re-checked the four cases scheduled for the December 1, 2026 Council public hearing against two City of Raleigh official sources. Coverage is rezoning cases and directly related matters only — the file includes one text change to zoning conditions (TCZ-38-26) and excludes site-plan and construction-drawing matters. It does not cover the City case table's decided cases from August–October 2026, and among 2025-numbered cases it includes only the one still in process (Z-22-24). Where a field was not obtained — most often the applicant — it is marked “Not obtained” rather than filled in. Gaps are labelled, not filled.
Whether a specific proposal can proceed, and on what conditions, is a determination for the City and the reader's counsel. Retain North Carolina land-use counsel to confirm any position before acting on it.
This page compiles public records and published regulations only. It offers no valuation and no legal conclusion.
Sources for this section: Raleigh case file (case-monitor/wake-cases-3.md), compiled from City of Raleigh official sources, checked 2026-11-28; Raleigh December 1 hearing check (case-monitor/raleigh-1201-hearing-check-20261129.md), checked 2026-11-29.
Monitored Cases
| Case | Project & location | Applicant | Type | Status & disposition | Latest action |
|---|---|---|---|---|---|
| Z-22-24 | Wilmington St Assemblage — 1000–1013 Mark St / 1001–1015 S Wilmington St area, 2.37 ac, R-10 (NCOD) → OX-7 (TOD) / RX-5 (TOD) | Copernica Properties, LLC (per application file linked from the official case table; contact Molly Stuart, Morningstar Law Group) | Rezoning | Additional Materials Needed | Not obtained (status carries no date) |
| Z-06-26 | 1901 Old Milburnie Rd — approx. 28.54 ac portion, AP → R-6; with AX-02-26 | Milestone Developments, LLC (per official application file; owner Beaver Dam Lake, Incorporated) | Rezoning (with Annexation AX-02-26) | Second Neighborhood Meeting Required | Not obtained (status carries no date; application file received 2026-02-13) |
| Z-10-26 | 7008 Perry Creek Rd | Not obtained | Rezoning | Second Neighborhood Meeting Required | Not obtained (status carries no date) |
| Z-20-26 | 3725 Harden Rd — approx. 7 ac, R-4 → OX-7-CU | Jamie Schwedler, Parker Poe (application contact, per official neighbourhood-meeting notice; applicant entity not obtained) | Rezoning | Planning Commission 01/12/27 | 2027-01-12 (scheduled) |
| Z-23-26 | 717, 721-735 Chappell Dr | Not obtained | Rezoning | Council Public Hearing 12/01/26 | 2026-12-01 (scheduled) |
| Z-24-26 | 1613 Battery Dr | Not obtained | Rezoning | Council Report of PC 01/05/26 (as printed in the source; suspected misprint, not verified) | Not obtained |
| Z-25-26 | 111, 113 Ashe Ave & 0 Wakefield Ave (Ashe Avenue and Wakefield Avenue) | Not obtained | Rezoning | Council Public Hearing 12/01/26 | 2026-12-01 (scheduled) |
| Z-26-26 | 5621, 5615 Kyle Dr (ETJ) | Not obtained | Rezoning | Planning Commission 01/12/27 | 2027-01-12 (scheduled) |
| Z-28-26 | 1900 Wimbish Ln | Not obtained | Rezoning | Council Public Hearing 12/01/26 | 2026-12-01 (scheduled) |
| Z-29-26 | 2901 Forestville Rd (ETJ) | Not obtained | Rezoning | Second Neighborhood Meeting Required; Traffic Impact Analysis Required | Not obtained (status carries no date) |
| Z-32-26 | 2512 Prince Dr (ETJ; with AX-26-26) | Not obtained | Rezoning (with Annexation AX-26-26) | Council Public Hearing 12/01/26 | 2026-12-01 (scheduled) |
| Z-34-26 | 4017 Watkins Rd (ETJ) | Not obtained | Rezoning | Council Report of PC 01/05/26 (as printed in the source; suspected misprint, not verified) | Not obtained |
| Z-35-26 | 5000 Duraleigh Rd | Not obtained | Rezoning | Second Neighborhood Meeting Required | Not obtained (status carries no date) |
| Z-36-26 | 727, 729 W Morgan St | Jamie Schwedler, Parker Poe (application contact, per official application file; owner West Morgan LLC) | Rezoning | Planning Commission 12/01/26 | 2026-12-01 (scheduled) |
| Z-37-26 | 3839 Jackson St & 0 Whitmore Dr | Not obtained | Rezoning | Council Report of PC 01/05/26 (as printed in the source; suspected misprint, not verified) | Not obtained |
| TCZ-38-26 | 1000, 1100 Trailwood Dr (ETJ) | Not obtained | Text Change to Zoning Conditions (TCZ) | Second Neighborhood Meeting Required | Not obtained (status carries no date) |
| Z-39-26 | 8401 Honeycutt Rd — R-1 w/FWPOD → R-6-CU w/FWPOD, capped at 10 dwellings | Not obtained (the official application-file excerpt obtained did not include an applicant field) | Rezoning | Planning Commission 01/12/27 | 2027-01-12 (scheduled) |
| Z-41-26 | 1010, 1020 St Albans | Not obtained | Rezoning | Initial Review Due 12/15/26 | 2026-12-15 (review deadline) |
| Z-04-26 | 5750 Louisburg Rd (with Annexation AX-27-26, approved the same day) | Not obtained | Rezoning | Approved 11/17/26 | 2026-11-17 |
| Z-13-26 | 606 Dorothea Dr (formerly 767 S Saunders St) | Not obtained | Rezoning | Approved 11/17/26 | 2026-11-17 |
| Z-21-26 | 2905 Hodge Rd (with AX-18-26) | Not obtained | Rezoning (with Annexation AX-18-26) | Approved 11/04/26 | 2026-11-04 |
| Z-22-26 | Bragg St & S East St Assemblage | Not obtained | Rezoning | Approved 11/04/26 | 2026-11-04 |
| Z-30-26 | 2402, 2404, 2408 Clark Ave & 300 Horne St | Not obtained | Rezoning | Withdrawn 11/04/26 | 2026-11-04 |
Verification notes. Source basis: the City of Raleigh official Rezoning Cases table (raleighnc.gov) as the master table, cross-checked against the City's Public Hearings page (updated 2026-11-18) for the four December 1, 2026 hearing cases; applicant fields were taken only from official application files (City drupal file library PDFs) actually opened in the monitor round — 5 files were opened, 4 yielded applicant or owner information, and the excerpt for Z-39-26 did not include an applicant field. Checked 2026-11-29 (base snapshot 2026-11-28; hearing re-check 2026-11-29). Fields not obtained: the applicant for 19 of 23 cases, and the latest-action date for every case whose status wording carries no date. The December 1 hearing check covered the two City pages themselves; case-level application files and agenda packets were not re-opened in that round, so new case-level filings are not obtained. Status is as stated on the official source page; consult the official page for the current status of any case.
Process Steps
The steps stated here are the statewide statutory steps for a zoning-map amendment under N.C.G.S. Chapter 160D, Article 6, as cited in the sample dossiers, with the Raleigh practice observed in the cases of record stated where the cases show it. Raleigh specifics the cases do not reach — ordinance text, forms, fees, staff-review cycle, and utility path — are marked [未核實].
- Check the by-right posture first — from the jurisdiction's own record. The current development ordinance, zoning districts, permitted-use tables, and density and lot standards for Raleigh were not in the monitor files used for this page and are [未核實] here. They must be read from the current published ordinance and confirmed against the parcel's PIN in Wake County records before any yield is underwritten.
- Pre-application steps — local rule [未核實] unless the case record shows otherwise. Whether Raleigh requires or offers a pre-submittal, pre-application, or sketch-plan meeting, and on what schedule, was not recorded in the monitor files used for this page, except as stated in the observed practice below.
- File a complete petition — local form, deadline, and fees [未核實]. The local application form, submittal deadline cycle, portal, and fee amounts were not in the monitor files used for this page. The case-number format is of record from the cases in the Monitored Cases table below.
- Staff and technical review — local cycle [未核實]. No local staff-review or technical-review cycle, comment schedule, or resubmittal timing was recorded in the monitor files used for this page, except for any review-stage status wording reproduced in the case table. No timeline for a filing can be built from this record set beyond the anchors in the Timeline Anchors section.
- Neighbourhood meeting — as the case record shows it. The observed practice in the monitored cases is listed below; any general local rule on timing and notification radius beyond what those cases show is [未核實].
- Planning Commission / Planning Board review and recommendation. Under N.C.G.S. Section 160D-604(b) and (d), all proposed zoning-map amendments shall be submitted to the planning board for review and comment. If no written report is received within 30 days of referral, the governing board may act without it. The planning board must advise on plan consistency, and its recommendation does not bind the governing board.
- Legislative hearing — published notice. Under N.C.G.S. Section 160D-601(a), the governing board shall hold a legislative hearing before adopting any amendment. Notice must be published once a week for two successive calendar weeks, with the first publication not less than 10 nor more than 25 days before the hearing.
- Legislative hearing — mailed and posted notice. Under N.C.G.S. Section 160D-602(a) and (c), owners of the affected parcel and of all abutting parcels must be mailed notice by first-class mail, deposited at least 10 but not more than 25 days before the hearing. Notice must also be prominently posted on the site or the adjacent right-of-way within the same window.
- Governing board decision, with two statements. Adoption is by ordinance. Under N.C.G.S. Sections 160D-601(c) and 160D-605(a)–(c), the board must approve a plan consistency statement and, for a map amendment, a statement of reasonableness. The two may be a single statement. If the request is for a conditional district, N.C.G.S. Section 160D-703(b) limits conditions to those consented to by the petitioners and addressed to conformance and reasonably expected impacts.
- After rezoning, separate approvals still follow. A rezoning does not itself complete the path. Subdivision plats, site plans, construction drawings, utility arrangements, and state and county permits follow under their own procedures — for Raleigh, each of those procedures is [未核實] in the monitor files used for this page, including how water and sewer capacity or allocation is decided. A denied or withdrawn application may not be subjected to a local waiting period before refiling, under N.C.G.S. Section 160D-601(e).
Local practice actually observed in the monitored cases:
- Five in-process cases stood at a second neighbourhood meeting: Z-06-26, Z-10-26, Z-29-26, Z-35-26, and TCZ-38-26 each carried the status “Second Neighborhood Meeting Required” at the 2026-11-28 snapshot. The monitor records the status wording; it does not record a general Raleigh rule on when a second meeting is required.
- Four cases were scheduled to the same Council Public Hearing date, December 1, 2026 (Z-23-26, Z-25-26, Z-28-26, Z-32-26), and the Public Hearings page listed that hearing for December 1, 2026 at 7 p.m. One of the four, Z-28-26, had previously been scheduled for a November 17, 2026 hearing and was later rescheduled to December 1, per the monitor's earlier-round context.
- Planning Commission dates appear in the record as scheduled next steps: January 12, 2027 for Z-20-26, Z-26-26, and Z-39-26, and December 1, 2026 for Z-36-26.
- Three cases pair the rezoning with a companion annexation in the same record: Z-06-26 with AX-02-26, Z-32-26 with AX-26-26, and — among the decided cases — Z-04-26 with AX-27-26 and Z-21-26 with AX-18-26.
- One case shows an early review deadline as its status: Z-41-26, “Initial Review Due 12/15/26.” One older case shows a materials hold: Z-22-24, “Additional Materials Needed.”
Sources for this section: N.C.G.S. Sections 160D-601, 160D-602, 160D-604, 160D-605, and 160D-703(b), as cited in Sample Dossiers No. 1 and No. 2; case facts and sequence: the monitor files listed in the Sources section, compiled and checked as stated there.
Timeline Anchors
Statutory floor, not a forecast. The notice provisions alone impose roughly 3–4 weeks between a complete filing's hearing notice and a lawful vote — a 10-to-25-day notice window and two successive weeks of publication — plus the planning board's 30-day review window under Section 160D-604(b), which can run concurrently. No statute cited in the monitor files sets a total decision deadline.
Observed dates in the Raleigh record — dates only, where both are of record:
- 2026-02-13 — The application file for Z-06-26 was received, as recorded in that file; the case stood at “Second Neighborhood Meeting Required” at the 2026-11-28 snapshot, with no later action date obtained.
- 2026-11-04 — Two cases were approved (Z-21-26, Z-22-26) and one was withdrawn (Z-30-26).
- 2026-11-17 — Two cases were approved (Z-04-26, with its companion annexation AX-27-26 approved the same day; Z-13-26).
- 2026-11-18 — The City's Public Hearings page was last updated, as marked on that page; the 2026-11-29 re-check found the same update date.
- 2026-12-01 (scheduled) — Council Public Hearing for Z-23-26, Z-25-26, Z-28-26, and Z-32-26, at 7 p.m. per the Public Hearings page; Planning Commission date for Z-36-26 the same day.
- 2026-12-15 (deadline) — Initial Review Due date recorded for Z-41-26.
- 2027-01-12 (scheduled) — Planning Commission date recorded for Z-20-26, Z-26-26, and Z-39-26.
What the observed record shows, as fact only. The monitor file is a snapshot: for most in-process cases it records a current stage, not a start-to-finish span, and no filing-to-decision duration can be computed from it for any Raleigh case except the receipt-to-snapshot interval noted for Z-06-26 above. No “typical” Raleigh duration is stated on this page.
Sources for this section: N.C.G.S. Sections 160D-601, 160D-602, and 160D-604; Raleigh case file (case-monitor/wake-cases-3.md), checked 2026-11-28; Raleigh December 1 hearing check (case-monitor/raleigh-1201-hearing-check-20261129.md), checked 2026-11-29.
Common Red Flags
These are points of friction documented in the 23 Raleigh cases of record, together with the gaps that record still leaves. They are prompts, not predictions about any parcel.
- Most cases on file have no disposition yet. 18 of 23 cases were still in process at the snapshot. A status in the table is a stage, not an outcome, and no outcome is predicted on this page for any in-process case.
- The applicant is missing for 19 of 23 cases. The City's official case table does not list applicants; the monitor obtained applicant information only where it opened the official application file. A buyer cannot tell from the master table alone who stands behind most Raleigh filings in this file.
- A second neighbourhood meeting is a live gate in five cases. Z-06-26, Z-10-26, Z-29-26, Z-35-26, and TCZ-38-26 each stood at “Second Neighborhood Meeting Required,” and Z-29-26 additionally required a Traffic Impact Analysis. Those requirements sit between the snapshot stage and any hearing.
- Hearing dates move. Z-28-26 had previously been scheduled for a November 17, 2026 hearing before standing at December 1, 2026. The 2026-11-29 re-check also records a limit: the Public Hearings page had not been updated since November 18, 2026, so a rescheduling published only through another City channel after that date could not be excluded from those two pages alone.
- Three status dates are reproduced as printed and flagged, not corrected. Z-24-26, Z-34-26, and Z-37-26 carry “Council Report of PC 01/05/26” in the official table — a date that does not fit the late-2026 sequence and is suspected to be a misprint for 01/05/27. The monitor does not correct it, and neither does this page; verify the stage against the official page before relying on it.
- Companion annexations ride with several cases. Z-06-26 (AX-02-26), Z-32-26 (AX-26-26), Z-04-26 (AX-27-26), and Z-21-26 (AX-18-26) each pair the rezoning with an annexation petition. A parcel in the ETJ — as Z-26-26, Z-29-26, Z-32-26, Z-34-26, and TCZ-38-26 are marked — carries that second track.
Sources for this section: Raleigh case file (case-monitor/wake-cases-3.md), checked 2026-11-28; Raleigh December 1 hearing check (case-monitor/raleigh-1201-hearing-check-20261129.md), checked 2026-11-29.
Call to Action — Send a Precise Inquiry
If you are screening a specific Raleigh parcel, send a precise inquiry that names the town and the case number, so the public record can be matched without guesswork.
Include, at minimum:
- Town name: Raleigh
- Case number, in the City's format — rezonings carry a Z- prefix (for example Z-23-26), a text change to zoning conditions carries a TCZ- prefix (for example TCZ-38-26), and a paired annexation carries an AX- number; give the number exactly as it appears on the City document you are relying on
- The parcel address or PIN, if you have it
An inquiry that gives only a road name or a project nickname, without a town name and a case number, cannot be matched reliably to a single public case file. Whether PermitDossier can take on a specific inquiry, and on what terms, is [未核實] on this draft page and must be confirmed on the live contact route before any reliance.
Sources
All sources below are the monitor files used for this page and the official sources those files record. No other source was used for any fact on this page.
- Raleigh case file (case-monitor/wake-cases-3.md), compiled and checked 2026-11-28: 23 Raleigh cases (18 in process, 5 decided in November 2026), built from the City of Raleigh official Rezoning Cases table (raleighnc.gov/node/50576) as the master table, cross-checked against the City's Public Hearings page (updated 2026-11-18) for the four December 1, 2026 hearing cases, with applicant fields taken only from official application files in the City's drupal file library that were opened in that round (Z-22-24, Z-06-26, Z-20-26, Z-36-26, Z-39-26). News and aggregator sites were used in that file as leads only, not as facts of record.
- Raleigh December 1 hearing check (case-monitor/raleigh-1201-hearing-check-20261129.md), checked 2026-11-29: the four December 1, 2026 Council public hearing cases (Z-23-26, Z-25-26, Z-28-26, Z-32-26) re-checked against the City's Rezoning Cases table and its Public Hearings for City Council page (raleighnc.gov/public-hearings-city-council, marked Updated: Nov 18, 2026) — all four still listed for December 1, 2026, with no postponement, rescheduling, withdrawal, or cancellation recorded in either source; case-level application files and agenda packets were not re-opened in that round.
- North Carolina General Statutes — Chapter 160D, Article 6, Sections 160D-601, 160D-602, 160D-604, 160D-605, and Section 160D-703(b), as cited in Sample Dossiers No. 1 and No. 2 (official text, ncleg.gov).
Scope and Fence Statement
This draft page compiles public records and published regulations; it is not a legal opinion. Retain North Carolina land-use counsel to confirm.
- No valuation or appraisal. This page contains no opinion of value, price, or worth for any parcel, and no broker price opinion or comparative market analysis. Under N.C.G.S. Section 93A-83(f), an opinion that estimates the value or worth of real estate is deemed an appraisal and may only be prepared by a duly licensed or certified appraiser under North Carolina Appraisal Board regulations. Any county assessed figure cited in an underlying record is a tax-administration record, not a valuation by this page.
- No legal conclusion. Statements on this page describe what published ordinances, statutes, and public case records say. Whether a specific proposal complies, will be approved, or is vested is a legal determination for North Carolina land-use counsel and the Town of Raleigh.
- Currency. The statutory text is as cited in the sample dossiers (accessed 2026-11-27); the Raleigh case record is as compiled on 2026-11-28 and re-checked for the December 1 hearing cases on 2026-11-29. 18 of the 23 cases were still in process in that record; any Raleigh case status relied on in a transaction must be checked against the City's current record.
- Gaps are labelled, not filled. Items marked as unverified in this draft are gaps in the verified sources used for this page. They are not findings that the underlying fact does not exist, and they must be verified from a primary record before this draft is used anywhere public.